From Activities to Spacetypes

With the use of data from WorkNavigator, how do we go from activities to spacetypes with the use of SpacePro?


This is a 4 step process.


  1. Activities
  • Hours spent on activities, rated based on importance, complexity, and level of collaboration
  • Normalized per group, and adjusted to required settings.

  1. Worksettings
  • Adjusted to the in-office percentage
  • Allocated to worksettings; the number of fulltime worksetting seats.

  1. Generators

    We create generators that generate spaces in two ways:

  • Parametric.
    • Based on [X] FTE, generate [Z] phone booths.
  • Behaviorbased.
    • Based on [X] fulltime seats in worksetting [Y], generate [Z] two- person offices.

  1. Spacetypes
  • This generates a list of spacetypes, which can be tagged with groupnames and other classifications.
  • Quantities of spacetypes can be adjusted and overwritten.